Well, it's been a busy 5 weeks. Here's what has been replaced or fixed so far; clutch, rear main seal, front crank seal, all belts including timing belt, left axle, all locks including ignition lock, LX horn pad, new front and rear brakes, all 4 struts, shifter bushings, valve cover gasket, water pump, left power mirror, left door, left fender, air filter, taillight assembly, muffler, right rear glass(2 pieces) dashboard trim.
I still need to get the plates, alignment, inspection and tires. A/C repair later this year.
And yes, I spent way too much on this pile of sheite.
I still need to get the plates, alignment, inspection and tires. A/C repair later this year.
And yes, I spent way too much on this pile of sheite.
Comment