View Single Post
Old 07-09-2009, 09:00 PM   #134
Dan [Sac]
Registered User
 
Dan [Sac]'s Avatar
View My Photo Gallery
 
 
Join Date: Dec 2007
Location: Sacramento
Posts: 668
Merchant Status: (6)
Positive Feedback Percent: (100)

Today's work:

All I did today was weld holes shut...did about 45 today, and I'm almost halfway done with the holes. A ton of them around when you have the wiring in stock locations (most are for harness plastic clips).

Got the upper rad. support nice & smooth, and the right side (almost said "passenger" side) frame rail half done. By no means is any part done, I just put the etching primer on to not get any corrosion from the night time dew. I will still smooth them over one more time and then fill the stock spot weld divots with body filler for a super smooth look (Rage Xtreme is the ****!)

Weather's been fantastic, other than a few days over 105, it's been mostly low 90s so working outside is nice.

Before:







After:




__________________
'90 Mazda 323 - V6 KLDE, supercharged, right-hand drive,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

'93 Ford Probe GT -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

10.24 @ 139.5 mph [16 psi] -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

490whp, 447 wtq @ 20psi -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Dan [Sac] is offline  
Reply With Quote